1. England
  2. Scotland
  3. Wales

Legal in Great Britain since 27 August 2026. Send us a postcode and we will tell you what the rules allow there.

Plug-in SolarBritain

Plug-in Solar Britain / Sources

Every source we rely on

The regulations, the specification, the planning guidance and the generation data, with the date we read each one.

How we use them

We read the primary document rather than somebody’s summary of it. Where a thing is not settled we say so instead of filling the gap.

Three of these are worth the caution that travels with them. Our map of the fourteen licence areas is a working one and has not been checked postcode by postcode, which is why we also give you 105. The generation figures are modelled at one point per region under ideal conditions, so they are a ceiling rather than a forecast. And we name no device as compliant unless we have read its record on the register ourselves.

Rows of terraced houses climbing a valley hillside in south Wales

Terraces climbing the valley side in south Wales. Wales has its own planning rules and they are not England’s, which is the sort of thing these documents settle.

  • The Plugs and Sockets etc. (Safety) Regulations 1994 and Electricity Safety, Quality and Continuity Regulations 2002 (Amendment) Regulations 2026

    SI 2026 No. 848. Made 16 July 2026, in force 27 August 2026. The instrument that made plug-in solar legal, and the source of the 800 watt definition.

    Read 13 September 2026. Open the source

  • Plug-in Solar Device Interim Product Specification, version 2.0

    Department for Energy Security and Net Zero, July 2026. The 800 VA and 3.5 A limits, four panels, two in series, 2000 W of panel, the 960 W assessment threshold, IP55 outdoors, the prohibited adaptors, and the requirement to register on the ENA Type Test Register. Version 1.0 is withdrawn.

    Read 13 September 2026. Open the source

  • The Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2026

    SI 2026 No. 896. Made 29 July 2026, in force 27 August 2026. The planning definition of plug-in solar, the timber wall, balcony, enclosure and cladding exclusion, and the 200 mm and 400 mm projection limits.

    Read 13 September 2026. Open the source

  • Planning Portal guidance on solar equipment on a house or a block of flats

    The summary of the 27 August 2026 change and the twelve month transitional period running to 27 August 2027.

    Read 13 September 2026. Open the source

  • Ofgem decision on Distribution Code modification DCRP/MP/26/02

    Dated 11 August 2026. Engineering Recommendation G98 Issue 2 Amendment 1, and the restriction to one device per household.

    Read 13 September 2026. Open the source

  • Plug-in solar: final stage impact assessment

    DESNZ, 16 July 2026. The 28 day registration process, the export tariff link, the restriction on combustible cladding and buildings under remediation, and the position of Northern Ireland.

    Read 13 September 2026. Open the source

  • Government response to the plug-in solar consultation

    July 2026. Landlord and freeholder consent, lease restrictions, older wiring, and the argument about batteries.

    Read 13 September 2026. Open the source

  • ENA Type Test Register, Connect Direct live device register

    Searchable without a login. Manufacturer, model, type, registered capacity and compliance status, with non-compliant devices kept on the list.

    Read 13 September 2026. Open the source

  • Circular 1/2024: householder permitted development rights

    Scottish Government. Class 6HA and Class 6HB, the one metre and 500 mm limits, and conservation areas. No mention of plug-in solar.

    Read 13 September 2026. Open the source

  • Planning permission for solar panels

    Welsh Government. The 200 mm limit, the flat roof rules that differ from England, and standalone panels. No mention of plug-in solar.

    Read 13 September 2026. Open the source

  • Photovoltaic Geographical Information System

    European Commission Joint Research Centre. Every generation figure on this site: 0.8 kWp, 14 per cent system losses, four mountings at one point per region, queried 13 September 2026.

    Read 13 September 2026. Open the source

Vendor blogs and retailer compliance tables are not sources. Where two sellers contradicted each other about the same product we recorded the contradiction and left it unresolved rather than picking one.

Not sure it's allowed at yours?

Postcode and where you'd put it. We'll check the rules for you.

  • England
  • Scotland
  • Wales

Start with your postcode

Name, email, postcode, and where you'd put the panel. We reply with whether the rules cover that spot, what it would generate there, and what happens next.

We reply by email. Nothing is sold on and no manufacturer pays us.